How to Get Bathtub Replacement Done Right the First Time
The bathtub is the centerpiece of many bathrooms, a place to relax and unwind. However, over time the tub can become damaged or outdated. Choosing to replace the tub is a significant decision, one that can dramatically change the look and feel of the space. The process is intricate, but with the help of a professional, it can be done seamlessly and without much hassle.
If your tub has a crack, chip, or stain, it may be time to consider replacement. These imperfections can lead to water leaks, which can damage your home and increase energy bills. Also, a small chip can quickly grow into a large crack that poses a safety risk and makes the tub prone to further damage and rust.
A new tub will not only increase your enjoyment of the space, but it can also add value to your home. Potential buyers are looking for updated bathrooms, and a beautiful bathtub will help you achieve the asking price you are hoping for.
While replacing a bathtub is a do-it-yourself project, it is not for beginners. It requires a lot of skill, experience, and knowledge to ensure that the installation is completed correctly and safely. A professional will ensure that the job is done right the first time, saving you money and time in the long run.
Ultimately, hiring a bathroom remodeling company for bathtub installation is the safest and most cost-effective option for your mobile home. It’s easy to overlook the importance of proper installation and end up with a leaky, moldy, or unsightly fixture that reduces your home’s value and comfort level. Professionals can prevent these issues by performing a quality installation and by offering warranties or guarantees on their work. This gives you peace of mind that your custom bathtub will last for years to come.
Before you begin, make sure that the main water supply is turned off. This will prevent any leaks from occurring during the remodel and minimize water damage. The area around the bathtub should be checked for existing leaks as well. If there are any, these should be fixed before installing the tub.
If the old tub is able to be removed by sliding it straight out, you can begin by placing 1×4 skids on the floor to avoid damaging the bottom of the tub. Then, place a piece of plywood on top of the skids to make the transition from the tub to the floor smooth. It is important to have a helper; tubs weigh plenty and are difficult to move by yourself.
Once the old tub is removed, the framing on the wall that it was installed against must be re-instated or the new tub will not sit level. This will require cutting into studs, which is not an easy task. It is recommended that you shore up the studs with two or three lengths of 2×4 before making any cuts, to help avoid future problems.
When the framing is finished, the new bathtub can be set in place. Be careful to position the flange on the back wall so that it is not hitting the overflow or drain pipe. Use a bubble level to ensure that the flange is perfectly flat and that the reference marks on the tub studs line up with those on the flange. Once everything is lined up, the flange can be fastened to the studs using roofing nails or galvanized screws.
Once the new flange is secure, connect the drain/overflow plumbing to the tub. Be sure to tighten the connections with a wrench, but don’t over-tighten them. Once the spout is reattached, turn the water back on and allow it to flow for 24 hours before using.